How many supplemental pumps will be needed to pump such a great distance? What is the provision for power outages? How long will generators run the system?
In Phase 1, the pump stations will be added to the two existing septic tanks. No supplemental pumps will be required. A genset will provide power backup in the case of power outages, as in other CVRD water and sewer systems. A diesel genset runs 24-48 hours, depending on the load and size of fuel tank, without refueling. There is also some additional storage capacity in the septic tanks

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.