When do I need a building permit to do work in the Regional District?

A building permit is required before:

(a) constructing, reconstructing, repairing or altering a building or structure,

(b) removing or relocating a building or structure,

(c) changing an occupancy or use of a building or structure,

(d) conducting a “tenant improvement” in an existing commercial or industrial suite,

(e) removing, altering or adding a plumbing distribution system and or drain, waste and venting system,

(f) demolishing a building,

(g) constructing or adding a fireplace, woodstove or chimney,

(h) constructing or altering a farm building or,

(i) constructing or altering a retaining structure.

Note: Gas and Electrical Work is regulated by Technical Safety BC

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.